1 (800) 353-2087 info@biorem.biz

Cape Coral

  • Cape Coral Case Study
  • Cape Coral Case Study
  • Cape Coral Case Study
  • Cape Coral Case Study
  • Cape Coral Case Study
  • Cape Coral Case Study

About the Project

BACKGROUND

Two years ago city planners embarked on a plan to improve Cape Coral’s utilities in order to keep pace with
user demands. The main elements of the plan included an upgrade to the city’s Southwest and Everest wastewater
treatment plants, as well as an expansion of production capabilities at the Southwest reverse osmosis water
treatment plant. The improvements are seen as critical to improving the city’s water and sewer infrastructure
in coming years and to accommodate an expected doubling of the population by 2030. As part of the Southwest
wastewater treatment plant expansion, the city installed an odor control system using two of Biorem’s biotrickling
filters. The system was commissioned in March of 2009. Specially designed to remove hydrogen sulfide (H2S) odors
from wastewater environments, Biorem biotrickling filters can remove a wide range of water-soluble contaminants
from process airstreams at reasonable cost compared to other systems.

Download the Case Study here: Cape-Coral-Case-Study.pdf

Share